top of page

TKH Construction Blog


How Long Does It Take to Build a Custom Home in Ontario? (Oakville, Milton,Caledon, Toronto/GTA, Kitchener-Waterloo)
Learn the realistic timeline to build a custom home in Ontario (typically 12–18 months), including design, permits, construction phases, and how ICF can help in Oakville, Milton, Caledon, Toronto/GTA, and Kitchener-Waterloo.


Prefab vs. Traditional Construction in ICI : What’s the Difference?
In the ever-evolving world of Industrial, Commercial, and Institutional (ICI) construction, the methods we use to build are just as important as what we build. At TKH Construction, we’re seeing a growing demand for prefabricated (prefab) construction - and for good reason. So how does prefab construction stack up against traditional methods? Let’s break it down. Lets start with the definitions then show the key differences. ____________________________________________________
bottom of page
.png)